Store Banner
 
ACEC Members
Click here to login and receive member discounts

CASE Tool 9-1: A Guideline Addressing Coordination and Completeness of Structural Construction

Code: 12484-DL

List Price:  $60.00

Member Price:  $30.00

Select Item Select Item
Select Item

CASE Tool 9-1: A Guideline Addressing Coordination and Completeness of Structural Construction Documents
CASE Tookit Committee

Inadequate and/or incomplete design drawings often result in inaccurate competitive bids; delays in schedule; a multiplicity of requests for information (RFIs), change orders and revision costs; increased project costs; and a general dissatisfaction with the project. The guidelines presented in this document will assist not only the structural engineer of record (SER) but also everyone involved with building design and construction in improving the process by which the owner is provided with a successfully completed project.

There are two PDF files included with the Tool: one with Tool 9-1 and the other with the CASE Drawing Review Checklist.

Please see companion document, CASE 962-D - Practice Guidelines Addressing Coordination and Completeness of Structural Construction Documents

Available for immediate download.

Downloadable documents are final sales and are not returnable. Please double-check your order before hitting the submit button.

Product Details:
Author(s): CASE Toolkit Committee

ISBN: --
Year Published: 2008

Number of Pages:
We're sorry, but there is no inventory for the product you selected. Check out these other great products: